L1 |
8/26 | C. H. Sequin |
Intro to CAGD; course structure |
L2 | 8/31 | CHS |
Hodograph, turning number, continuity -- ASMT: GENUS-2 OBJECT |
L3 | 9/02 | CHS | Bezier curves, composites -- ASMT: BEZIER EXPERIMENT |
9/07 | HOLIDAY |
=== Labor Day === |
|
L4 | 9/09 | CHS | Interpolating data points -- ASMT: INSTALL SLIDE |
L5 | 9/14 | CHS | Lagrange interpolation; comparison of schemes -- ASMT: COMPOSITE BEZIER CURVE |
L6 | 9/16 | CHS | Space curves and sweeps -- ASMT: 3D COMPOSITE BEZIER |
L7 | 9/21 | CHS | Blossoming, B-splines -- ASMT: SWEEPS |
L8 | 9/23 | CHS | B-splines, Vertex and Knot Multiplicities |
L9 | 9/28 | CHS |
Surface patches, subdivision concepts, -- DUE: Paper Selections |
L10 | 9/30 | CHS |
Catmull-Clark -- ASMT: GOBLETS |
L11 | 10/05 | CHS |
Doo-Sabin, Loop Subdivision -- ASMT: GENUS-4 MESH |
L12 | 10/07 | CHS |
Zorin Subdivision, Differential geometry of surfaces |
L13 | 10/12 | CHS |
Root-3 Subdivision, Triangle data structure -- ASMT: GENUS-4 SD-SURFACE |
L14 | 10/14 | CHS |
Interpolatory Root-3 Subdivision, Hierarchy flattening, texture mapping |
L15 | 10/19 | Alexei CHS |
Sharp features -- DUE: PROJECT IDEAS Semiregular patterns on surfaces -- ASMT: TRIANGLE SUBDIVISION |
L16 | 10/21 | Eric |
Texture Synthesis |
L17 | 10/26 | CHS |
Surface Optimization ...MVS -- DUE: PROJET PROPOSAL DESCRIPTIONS |
L18 | 10/28 | Sushrut |
Progressive Meshes |
L19 | 11/02 | all |
PROJECT PROPOSAL PRESENTATIONS ("Venture Capitalist Rally") |
L20 | 11/04 | CHS |
NEW: Marching Cubes ... |
L21 | 11/09 | Toby |
T-Splines and T-NURCCs |
11/11 | HOLIDAY |
=== Veterans Day === |
|
L22 | 11/16 | Kerstin Arpad |
Creating Generative Models from Range Images -- DUE: PROJET PROGRESS REPORT Hierarchical Mesh Decomposition using Fuzzy Clustering and Cuts |
L23 | 11/18 | Evan |
Adaptively Sampled Distance Fields |
L24 | 11/23 | Minerva Alex |
Meshless Deformations Based on Shape Matching Deforming Meshes that Split and Merge |
L25 | 11/25 | Jimmy |
Modelling with Implicit Surfaces that Interpolate |
11/26 | HOLIDAY | === Thanksgiving === |
|
L26 | 11/30 | all | No Class -- Project work |
L27 | 12/02 | all | No Class -- Project work |
L28 |
12/07 |
all |
PROJECT PRESENTATIONS |
L29 |
12/09 |
all |
PROJECT PRESENTATIONS |
L30 |
12/11 |
all |
No Class -- Project Reports Due |