Jacobs Design Innovation Institute, North of Soda Hall, 2014-2015

Construction of ample studio space for hands-on design and prototyping projects

PHASE I : Below Ground : Site Preparation, Excavation, Basement Construction

Site Preparation    Shoring Up the Walls    Excavation    Piles    Piles   
Site Preparation

Shoring Up

Excavation

Placing the Piles

Lift-Out

Rebar    Concrete    Rebar_Pipes    Slab_1    Rebar_2   
Rebar

Concrete

Rebar & Pipes

Pouring the Slab (Part 1)

Rebar for Slab and Walls

Slab2    Shotcrete    More_Walls    Falsework    BasementCeiling   
Pouring Pillars and Slab

Shotcrete-Walls

More Wall Construction

Falsework / Formwork

Basement Ceiling Slab