Bridging the Gap

Bridging the Gap

Area

(cost)

Timing

Power

Validation

Number of Gates + Memory

1000

10,000

100K

1M

10M

Evolving

Technologies

Complexity

Designer’s

Depth of View

Design Abstraction

(e.g. Pre-Designed

Building Blocks)

Previous slide Next slide Back to the first slide View Graphic Version