ASIC (Effort)
Blocks:
- Specification (3 people, 1 month)
- Multiplier design (1 person, 3 months)
- Register file design (1 person, 3 months)
- Logic/VHDL design (1 person, 1 month)
- gated clocking system design (1 person, 2 months)
- component assembly and verification (3 people, 1 month)
Total: 3 people, ~5 months