DesignWareTM Development Lifecycle
Requirements
Phase
Planning
Phase
Development
Phase
Verification
Phase
Rollout
Phase
Planning Checkpoint
Development Checkpoint
Verification Checkpoint
Rollout Checkpoint
Strict pass criteria at each checkpoint
Signoff required for each phase
ISO 9000-like
All blocks adhere to common process
Marketing
Requirements
Document
Product and
Engineering
Specifications
Technical
Specifications
Tested Si prototype
with reports
Successful customer
synthesis and simulation
Synopsys
Previous slide
Next slide
Back to first slide
View graphic version