High Quality Documentation
Block Diagrams
Functional Specification
Description of parameters
Interface signal description
Timing diagrams/req’ments
Verification Strategy
Synthesis Constraints
Project it was used on
Personnel on the project
Verification Report
Technology used
Tools (w/version) used
Actual Timing/Area Results
Revision history for any modifications
1st Generation
1st Thru nth Generation
Synopsys
Previous slide
Next slide
Back to first slide
View graphic version