Getting ParLab ready for the big day - November 30, 2008
11_30_a (Large).JPG
11_30_b (Large).JPG
11_30_c (Large).JPG
11_30_d (Large).JPG
11_30_e (Large).JPG
11_30_f (Large).JPG
11_30_g (Large).JPG
Formal Opening of ParLab - December 1, 2008
12_1_aa (Large).JPG
12_1_ab (Large).JPG
12_1_ac (Large).JPG
12_1_ad (Large).JPG
12_1_ae (Large).JPG
12_1_af (Large).JPG
12_1_ba (Large).JPG
12_1_bc (Large).JPG
12_1_bd (Large).JPG
12_1_be (Large).JPG
12_1_bf (Large).JPG
12_1_bg (Large).JPG
12_1_bj (Large).JPG
12_1_bk (Large).JPG
12_1_da (Large).JPG
12_1_db (Large).JPG
12_1_dc (Large).JPG
12_1_de (Large).JPG
12_1_dg (Large).JPG
12_1_dh (Large).JPG
12_1_di (Large).JPG
PAR_Lab, top page:
--
Surge Phase
--
Demolition Phase
--
Reconstruction Phase
--
Outfitting Phase
--
Moving-In Phase