CITRIS
Headquarters Building
(Davis Hall North Replacement)
Capital Projecs' Information Page
CITRIS Headquarters Construction --
Photos of the ongoing process
The Site on the Berkeley Campus
Redesign Studies (2004):
Level F1 -- Level F2 --
Level F3
--
Level F4
--
Level F5
--
Level F6
--
Level F7
--
West Stairs
Original Visualization Studies (2002):
Artistic Conceptual Rendering (October 2002)
Computer Renderings of the Atrium Space: --
View1
--
View2
--
View3
--
View4
--
View5
The original model seen: --
from the West
--
from the North
Early Conceptual Floor Plans (2002):
Site Plan at level 3
--
Level F1
--
Level F2
--
Level F3
--
Level F4
--
Level F5
--
Level F6
--
Level F7
Page Editor:
Carlo H. Séquin